Logo Leemberg

New filling line for a major brewery

Projecten
  • Client: International brewery
  • Sector: Food & Beverage - Filling and packaging lines
  • Location: Zoeterwoude, the Netherlands

For a new high-capacity filling line at a major brewery site in the Zoeterwoude area, an international filling and packaging system supplier acted as main contractor. Early in the tender phase, the contractor brought in Leemberg Pijpleidingen & Apparatenbouw B.V., so all pipework and steel structures could be aligned with the overall line design right from the drawing board. Leemberg handled the detail engineering, supply, fabrication and installation of the stainless steel and carbon steel piping and the associated steel structures for this new line.

Challenge

The construction of the new line required a completely new filling installation, where pipework, structures, insulation, NDT and testing all had to fit seamlessly into the overall OEM design and the existing brewery site.

For Leemberg, this meant developing piping detail engineering within the contractor’s design constraints, delivering materials and structures on time, installing stainless steel and carbon steel piping in a hygiene-critical environment, and organising NDT (including endoscopic inspection), insulation and testing as one integrated package. All of this had to be done within a tight project framework and a shared schedule with the OEM and the brewery.

Result

Leemberg delivered the complete piping and structural scope for the new filling line: from detail engineering and material supply to fabrication, installation, endoscopic inspection, insulation, testing and commissioning. The piping installation is both technically and hygienically integrated into the OEM’s line design and was taken into operation by the brewery without issues.

The filling line supplier had one partner for the entire piping package, and the brewery now benefits from a new, reliably performing filling line.

Want to know more about the technical scope and our collaboration with KHS and Heineken?
Download the full New filling line – Zoeterwoude case and read how Leemberg managed the piping and structural scope from design to commissioning.

Wij staan klaar voor uw uitdaging
Heeft u een technisch vraagstuk?
Bel of mail ons direct. Onze specialisten schakelen snel en zorgen voor een oplossing die werkt.
©2026 - Leemberg. Alle rechten voorbehouden.
Volg ons:
chevron-down